Takeoffs are slow and manual
Estimators measure the same walls and slabs by hand, sheet by sheet, and do it again when a revision lands.
SmartManage reads your drawings, builds the model, prices and sequences the work, and catches conflicts before they reach the field. Your engineers approve every answer.
Press Replay AI takeoff to watch it work, then use the tabs. The 3D model stays in view: click a wall, a cost line or a flag and it lights up everywhere, because it's one project record.
Two-storey cast-in-place concrete and CMU · 60′ × 40′ · 3 sheets, 1 geotech report, 1 pump submittal
Click anything: a wall on the drawing, a beam in 3D or a cost line. The same element lights up everywhere, because it's one project record.
Switch a scenario on: the estimate, schedule and model all update, and the affected elements light up.
Illustrative preview of SmartManage.ai with an example project and example pricing. Not a real project, drawing set or bid.
They're just hard to see in a 60-sheet set, under a bid deadline, with a crew waiting.
Estimators measure the same walls and slabs by hand, sheet by sheet, and do it again when a revision lands.
A wall that's 10″ on one sheet and 8″ on another, a footing that ignores the geotech report: caught after the formwork is up.
A late door submittal or an unanswered RFI quietly pushes the critical path, and nobody sees it until the crew is idle.
Each part feeds the next, so the quantity on the drawing is the quantity in the estimate, the model, the schedule and the RFI.
Reads plans and sections, recognises structural and architectural elements, and measures them with a link back to the sheet.
In the demoMeasured elements become a 3D model you can isolate by level, trade, cost line or week.
In the demoQuantities roll up by CSI division. Try a design change or a price move and see cost and schedule change together.
In the demoActivities are sequenced from the model, so you can watch the job build week by week and see what each delay touches.
In the demoTracks every submittal against the date the field needs it, pre-reviews it against the spec, and drafts RFIs with references.
In the demoTurns field notes into issues, links them to the element and activity, and flags the ones that threaten the schedule.
In the demoHeavy civil and infrastructure contractors, construction managers, and owners' teams on public and private work.
Our engineers run the survey program on one of the largest Army Corps projects in Florida. SmartManage comes from the same team and the same habits: measure it, check it, write it down.
Federal water reservoir our field team surveys every two weeks.
Our terrain analytics platform, live today, turning drone surveys into cut/fill and quantities. terrainpulse.com ↗
Used only for your firm, never to train shared models. We agree data terms before anything is uploaded.
SmartManage drafts and checks. Nothing goes to an owner, engineer or sub without your sign-off.
We're working with a small group of contractors and construction managers to shape SmartManage before launch. You bring real drawings and real problems; we build around how your team works.
Anything else: hello@smartinfratech.com · 561.612.8833
Nothing during the program. Founding partners who stay through launch get founding-partner pricing, locked in.
They're used only for your firm, in your own workspace, and never to train shared models. We agree the data terms with you before anything is uploaded, and you can have it deleted at any time.
No. SmartManage drafts and checks. A person on your team approves every RFI, submittal comment, estimate and report before it goes anywhere.
That's what the founding program is for. Every quantity links back to where it was measured on the sheet, so your estimator can check it in seconds, and we track accuracy against your own takeoffs on the partner project.
It's designed to work alongside the tools you already use, importing and exporting schedules and documents, and to take over the reading, measuring, checking and first drafts.
Applications are open now. We start with a 30-minute call, then onboard one project. Early access opens to founding partners in 2027, as each part is ready.
Join the contractors shaping SmartManage. Two minutes to apply, one call to see if it's a fit.
Become a founding partner